HomeChandrayaan-2LaunchTimeline

Chandrayaan-2 Launch Timeline

Animation of Chandrayaan-2 orbit raising around Earth
Chandrayaan-2's Earth-bound orbit-raising phase. Animation: Phoenix7777, via Wikimedia Commons
Date (2019)Event
15 JulyFirst launch attempt aborted 56 minutes before liftoff (technical glitch in launch vehicle)
22 JulyLaunch at 09:13 UTC aboard GSLV Mk III-M1; injected into 45,475 × 169 km Earth orbit
24 July – 6 AugustFive Earth-bound orbit-raising manoeuvres using the onboard propulsion system
14 AugustTrans-lunar injection β€” spacecraft leaves Earth orbit for the Moon
20 AugustLunar orbit insertion; captured into 114 × 18,072 km lunar orbit
21 August – 1 SeptemberFour lunar orbit-lowering manoeuvres to a near-circular 119 × 127 km orbit
2 SeptemberVikram lander separates from the orbiter
3–4 SeptemberTwo deorbit manoeuvres place Vikram in a 35 × 101 km orbit
6 SeptemberPowered descent begins at 20:08 UTC; contact lost at 2.1 km altitude β€” lander crashes

The orbiter remained unaffected in its 100 km polar science orbit and continues operating β€” see the mission overview.

Source: Wikipedia β€” Chandrayaan-2